How much topsoil for a new lawn
Grass roots need loose soil to grow into, and a new lawn on compacted subsoil or builder’s fill struggles for years. The sheet below is prefilled with a 50 × 30 ft lawn at 4 in of topsoil, the minimum for seeding on poor ground. Type your own length and width, go to 6 in if the ground under it is clay or rubble, and it prints the cubic yards, the weight in tons and the cost at a bulk price you can edit.
For this example19.4 cu yd — topsoil needed at 4 in deep, about $681 in bulk.The sheet below is filled in for it; change any figure to your own.
Measurements
What you need
Quantity · Amount- 01Area to cover50 × 30 ft1,500 sq ft
- 02Topsoil needed at 4 in deep525 cu ft including 5 % extra19.4 cu yd
- 03Weight1.1 tons per cu yd21.4 tons
- 04Bulk topsoil$35 per cu yd19.4 cu yd$681
- 050.75 cu ft (40 lb) bags0.75 cu ft per bag at $4700 bags$2,450
- About 2 dump-truck deliveries (10–14 cu yd each).
The material
Prices — put in what you were quoted
How deep for a new lawn
A seeded or sodded lawn wants 4–6 in of topsoil over the subgrade: 4 in on decent existing soil that you have loosened with a tiller, 6 in on clay, gravel or the compacted fill left behind a new house. Grass roots reach 6 in and deeper in good soil, and the depth you give them sets how well the lawn handles a dry August.
Top-dressing an existing lawn is a different job: ¼–½ in of screened topsoil or compost raked in after aerating. Set the depth field to 0.5 for that.
- 01Subsoil, graded to fall away from the house, 1 in per 4 ft
- 02Screened topsoil, 4–6 in, raked level and rolled
- 03Sod or seed
Screened topsoil, garden mix, or fill
Ask what the yard is selling. Screened topsoil has been run through a mesh to take out stones, roots and clods; it rakes easily and is the usual choice under a lawn. A garden or lawn mix is topsoil blended with compost or sand, lighter and richer. Fill dirt is unscreened subsoil, often with rocks and clay; it is for raising grades, not growing grass, and belongs under the topsoil, never on top. Look at the pile before it is loaded: dark, crumbly, few stones, no sour smell.
Measuring and ordering
- Measure the lawn’s length and width; break an L-shaped yard into two rectangles and run the sheet twice, or add the areas with the square footage calculator.
- Set the depth: 4 in on workable soil, 6 in on clay or fill, 0.5 in to top-dress.
- Keep the 5 % settling allowance, and add another 5 % if the ground has been freshly tilled: loose soil settles about 10 % as it is watered and walked on.
- Read the weight. The sheet uses 1.1 tons per cubic yard for dry screened topsoil; wet soil weighs a third more.
- Edit the bulk price to the yard’s quote per cubic yard with delivery, and order in whole yards, rounded up.
- Ask for the drop where the wheelbarrow route is shortest, on a tarp or the driveway.
Grade, spread and settle
Before the soil arrives, rough-grade the subgrade so it falls away from the house at about ¼ in per foot for the first 6–10 ft. Take out rocks, roots and debris, and loosen the top 2–3 in with a tiller so the new soil binds to it instead of sitting on it as a separate layer.
Spread with a wheelbarrow and a rake, working from the far corner toward the pile. Level it with a landscape rake or a straight board; a lawn roller half-filled with water firms it enough to walk on without compacting it. Water the graded soil and let it settle for a few days before seeding: the low spots show up, and the 10 % you allowed is what fills them.
Weight and the pickup
Topsoil is heavy. A cubic yard of dry screened topsoil weighs about 1.1 tons and a wet one about 1.5, so a level full-size pickup bed holds 2 cu yd by volume but that load is 2–3 tons, well above a half-ton truck’s payload. Plan on one yard per trip, or have it delivered: a tandem dump truck brings 10–14 cu yd in one drop, and for a lawn of any size the delivery fee is cheaper than a day of trips.
Common mistakes
- Spreading topsoil over compacted subsoil without loosening it. The layers don’t bond and the lawn dries out at the seam.
- Grading toward the house. Check the slope with a level on a long board before the soil goes down.
- Buying fill and calling it topsoil. Fill is for raising grades; grass needs screened soil on top.
- Seeding straight after spreading. Water, wait, fill the low spots, then seed.
- Loading a half-ton pickup with two yards. Check the payload sticker in the door; it is lower than you think.
Open the topsoil calculator with these numbers
Questions people ask
- How many cubic yards of topsoil do I need for a lawn?
- Square feet × depth in inches ÷ 324 gives cubic yards; the sheet does it and adds the settling allowance. At 4 in, a cubic yard covers about 80 sq ft.
- How much does a cubic yard of topsoil weigh?
- About 1.1 tons (2,200 lb) dry and screened; up to 1.5 tons wet. The sheet uses 1.1 and lets you change it.
- Should I put topsoil down before seeding or sodding?
- Yes, if the ground is poor. Sod laid on hard subsoil roots slowly and dries fast. 4–6 in of topsoil, graded and settled, is the base for either.
- Can I use compost instead of topsoil?
- Mix it in rather than substitute: 2–3 in of compost tilled into the top 6 in improves poor ground. Pure compost settles a lot and dries out.